循泵坑凝泵坑施工作业指导书.doc 29页 - 原创力文档

admin

Download 循泵坑凝泵坑施工作业指导书.doc 29页 - 原创力文档 book pdf free download link or read online here in PDF. Read online 循泵坑凝泵坑施工作业指导书.doc 29页 - 原创力文档 book pdf free download link book now. All books are in clear copy here, and all files are secure so don't worry about it. This site is like a library, you could find million book here by using search box in the header.

其中凝结水泵坑部位由于孔洞较深(底标高为-9.30m), 循环水泵坑、凝结水泵坑地下结构施工作业指导书 为防止地下水渗入及雨水导致孔洞积水,在土方开挖完成后立刻施测出泵管并垫层浇筑部位具体位置,放置固定好泵管并垫层支模后立刻进行垫层浇筑。 凝结水泵坑垫层分两次施工,第一次施工完毕做好施工缝处理,按前半节所述垫层及超挖回填施工方法进行第二次施工。 由于受汽机基础开挖影响,本处超挖回填量较大,必须控制好定位放线环节,防止不必要的浪费。 4.3.1.2底板垫层模板用50×100mm木方,测量人员把垫层面标高投测在木方四角上,木方的顶面即为垫层浇筑完成面控制线。 4.3.1.3垫层砼:采用C20砼。


Read : 循泵坑凝泵坑施工作业指导书.doc 29页 - 原创力文档 pdf book online
Select one of servers for direct link:
Download File Read Online

Copy download link:
Copyright Disclaimer:
All books are the property of their respective owners.This site does not host pdf files, does not store any files on its server, all document are the property of their respective owners. This site is Google powered search engine that queries Google to show PDF search results. This site is custom search engine powered by Google for searching pdf files. All search results are from google search results. Please respect the publisher and the author for their creations if their books are copyrighted. Please contact google or the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.

Related 循泵坑凝泵坑施工作业指导书.doc 29页 - 原创力文档

All books are the property of their respective owners.
This site does not host pdf files all document are the property of their respective owners.
Please respect the publisher and the author for their creations if their books are copyrighted.
All eBooks displayed on this site may be used for educational purposes only.